Lump sums in European projects: a guide to the results-based model that simplifies reporting and reduces the bureaucratic burden
Lump sum: a simplified and increasingly widespread model
Reporting, to which we devote a chapter of the Handbook, is one of the most delicate and complex aspects of managing a European project. Over the years, the need has emerged, within European funding, for a simplification of reporting practices, which would make it possible to reduce the time spent on administrative aspects without compromising the principle of transparency and cost-effectiveness in relation to the results achieved.
This need was addressed starting with the 2014-2020 programming period: the Horizon 2020 program led the way, gradually introducing the simplified lump sum model over the last three years, which was then adopted and extended in the subsequent cycle (Horizon Europe 2021-2027). According to a 2024 study by the European Commission, 80% of beneficiaries view the lump sum model positively, especially because of the reduction in administrative burdens and the opportunity to focus more on project activities.
Thanks in part to these results, the lump sum model is becoming increasingly widespread in European calls for proposals. According to the information currently available, this trend will continue in the new 2028-2034 programming period (we discussed this here). Let us therefore take a closer look at what this model entails and what its impact is on the drafting and management of European projects.
Lump sums: what are they?
In the section of the Handbook dedicated to reporting, we provide an initial definition of what is meant by lump sums, or flat-rate sums, and what distinguishes them from traditional systems based on reporting actual costs.
Within the world of European projects, three types of lump sums can be identified:
- Those in which the amount is defined ex ante in the call for proposals (pre-fixed amount). This category is in turn divided into:
-
- cases where the pre-fixed amount relates to the types of projects (so that all projects under a given call will receive the same contribution), and
- cases where the pre-fixed amount relates to blocks of activities (in this case, the amounts allocated vary from project to project, depending on the “blocks” of activities selected);
- Those in which the amount is based on the project (project-based amount), so that the amount follows the lump sum method, but is different for each project. In this case, it is therefore necessary to submit a detailed budget with realistic cost estimates for each category, work package or beneficiary.
Guidelines and official documentation for European “lump sum” calls for proposals
The main European Commission documents to refer to regarding lump-sum funding are:
- The European Commission’s official manual on how to manage projects based on the lump sum system, an updated version of which was published in early June 2026. The Guide focuses on how to take the lump sum approach into account when submitting, evaluating and managing European projects;
- The Model Grant Agreement (MGA) for projects based on the lump sum system. This is the template for the grant agreement that the lead organization of the awarded project and the other beneficiaries of the consortium sign with the European Commission at the start of the project. The specific changes relating to the lump sum model are highlighted in purple in the text.
In addition to the manuals and official documentation, we also draw attention to the FAQ section of the Funding & Tenders portal, where you can filter your search and find questions and answers relating to the lump sum system.
In the “Guidance and documents – Reference documents” section of the Funding & Tenders Portal, you can search for all the documentation relating to lump sums for each program by selecting the name of the program in the filters on the left. Documents relating to lump sums can be found in the “simplified costs decisions” section. Within the program fact sheets or the single overview available on our platform, these resources can be accessed via the “DOC” link.
Lump sums in the various European programs
There are resources dedicated to specific programs. Although many aspects are common, this documentation makes it possible to take into account the technical and contextual aspects of each program.
- For Horizon Europe, you can consult the dedicated Funding & Tenders page, which contains documents for an initial overview: the presentation “Lump Sum funding: what do I need to know?”, the guidelines and tools to be used when writing and managing projects, such as the “Lump Sum Budget Table.”
- For Erasmus+, the key document is the Programme Guide published annually (the 2026 version is available here), which defines the use of lump sums depending on the actions funded. A “Handbook on the lump sum funding model” dedicated to Key Action 2, Partnerships for Cooperation, was also published for 2026. It is also recommended to monitor the FAQ section on the websites of the National Agencies that manage the program in the member countries.
- For the CERV program, you can consult the official decision authorizing the use of lump sums under the program here. We also draw your attention to the dedicated page of the National Contact Point for Italy and the answer to the FAQ on the documentation required in the event of audits of “lump sum” funding.
- For the Creative Europe program, the decision on the use of lump sums in the program, which also includes information on reporting, is available here.
Lump sums in project writing
The use of lump sums has specific implications for project writing.
- In terms of project structure , lump sums require rigorous and detailed planning, since payment is not linked to cost reporting but to the completion of work packages, outputs and activities. The project structure must therefore be very clear: the WPs and their outputs must be structured into coherent phases, the completion of which can be easily verified. A prudent approach is needed, in which WPs are of the right “size” and “granularity,” i.e., avoiding both concentrating too many activities in a single WP (which increases the risks, time and complexity of management) and excessive fragmentation (which entails more burdensome monitoring).
- In terms of the budget, even if payment is made through lump sums, it is important that the totals reflect the actual costs incurred to carry out the related activities and outputs. It is advisable to develop an internal budget during the writing phase, in which it is possible to assess the correspondence between the lump sums and the actual costs of implementation, also taking into account the differences between European countries. The various programs may have specific reference grids for certain types of lump-sum costs, such as personnel costs.
- At the consortium management level, it is very important that the distribution of the lump sum among the partners is defined during the drafting phase and, if necessary, governed by an internal partnership agreement. The agreement should define the responsibilities and activities/Work Packages assigned to each party, with safeguard mechanisms in the event of non-compliance that could, for example, jeopardize an entire WP.
Lump sums in project evaluation
During the evaluation phase of the project proposal, the evaluators take into account the estimated costs of the activities based on evaluation criteria whose name, content and placement may vary depending on the program (for example, they may fall under the criteria “Quality,” “Implementation” or “Resources”).
In the case of some programs, such as Horizon Europe, there are specific verification tools, for example, for calculating personnel costs, which make it possible to have a range for certain cost categories depending on the country and type of organization, which the evaluators will take into account. During the evaluation, the evaluators may also request a reduction in the costs identified as “lump sums” or their reallocation among different partners, beneficiaries and work packages (here are some tips on how to approach the evaluation).
Lump sums in project management
The main implication of lump sums in the project management phase is that the focus shifts to results: funding is in fact allocated on the basis of the achievement of results and the production of deliverables or outputs identified during the project design phase.
From an operational standpoint, the main reference document is the aforementioned Model Grant Agreement (MGA), which sets out the legal and financial foundations of the project. In particular, Article 20 of the MGA sets out the reporting procedures applicable to lump sums. In general, while it is not required to keep specific documentation concerning the costs actually incurred, it is nevertheless required to keep supporting documents that can prove the proper implementation of the project and the achievement of results.
For example, in the case of events where a minimum number of participants is required, it is essential to keep records of the participants; and if the event involves the participation of people in a specific age group, it is important that the records reflect this. This documentation must be made available upon request in the event of checks, audits or investigations by the European Commission, for a number of years following the end of the project, which varies depending on the program and the amount of funding.
With regard to the management of projects and grant agreements, we would like to draw your attention to a dedicated section of the Funding & Tenders portal, “IT how-to”, which applies in particular to Horizon Europe and to centrally managed projects (and therefore does not apply to programs such as Erasmus+, which are managed through the national agencies of the Member States). We recommend a section of “IT how to” that is specifically dedicated to reporting for “lump sum” projects.
Lump sums: a simplified but not straightforward model
In conclusion, the lump sum model introduces “Copernican” changes compared to the model based on actual costs, shifting the focus to the completion of Work Packages, activities and their outputs, with supporting documentation based on technical reports and the measurement of results, rather than on timesheets, invoices and tax receipts.
However, it is important not to underestimate the implications, because reducing the administrative burden does not mean simplifying the project as such.
On the contrary, the project will have to be rigorously planned and managed to ensure that the results are achieved and the grant is obtained.